Development Projects

All active and completed projects under PADA's jurisdiction

Total Budget Sanctioned

₹577.95 Cr

FY 2024-25
Budget Utilized

₹93.15 Cr

↑ 12% of total
Projects Completed

62/136

↑ 6 ongoing
Projects Found: 144
Total Budget: ₹0 Cr
🎓 education Ongoing
Supply of 34 Laptops to the meritorious students in Pithapuram Constituency

Pithapuram,Gollaprolu,Ukothapalli Started:
Budget0.2379116
🎓 education Completed
Providing 240 Benches and tables for 20 Schools in U.Kothapalli

U.Kothapalli Started:
Budget0.108
🎓 education Completed
Providing Science Labs at Z.P.H.S, Vannepudi, Kodavali, A.K. Mallavaram, Durgada. Chebrolu of Gollaprolu Ma ndal

Vannepudi, Kodavali, A.K. Mallavaram, Durgada. Chebrolu of Gollaprolu Mandal Started:
Budget0.25
🎓 education Completed
Providing Science Lab in Government Junior College for Girls, Gollaprolu

Gollaprolu Started:
Budget0.05
🎓 education Completed
Providing Science Lab in Z.P.H.S., Boys School, Gollaprolu

Gollaprolu Started:
Budget0.05
📁 NREGS Ongoing
Rejuvenation of water bodies (tanks) in 11 villages under WDC - PMKSY 2.0

Pithapuram,Gollaprolu,Ukothapalli Started:
Budget
📁 Municipality Ongoing
Development of Park at Seethayyagari Thota near Reddyraja Kalyanamandapam, Pithapuram town

Pithapuram - Started:
Budget0.60
📁 Municipality Ongoing
Construction of Skill Hub in Pithapuram

Construction of Skill Hub in Pithapuram

Pithapuram Tender Stage Started: - · Completed: -
Budget2.1
📁 TTD Completed
Development of Mada Veedhulu and renovations to existing TTD Kalyana Mandapam in Pithapuram

ensuring improved accessibility, better facilities, and a comfortable experience for devotees and visitors.

Pithapuram - Started: - · Completed: Completed
Budget0.79 Cr
📁 SSA Completed
Inauguration of PM SHRI Labs in SBMR Pithapuram and ZPHS Gollaprolu

promoting experiential learning, innovation, and digital skills among students.

Pithapuram,Gollaprolu - Started: - · Completed: Completed
Budget1.159 Cr
📁 RWS Completed
Special repairs & Improvements to CPWS Scheme to Gollaprolu and other habitations of Gollaprolu Mandal in Kakinada district (Fencing to SS Tank)

providing protective fencing around the SS Tank, preventing unauthorized access, contamination, and damage to critical water storage infrastructure. This will ensure hygienic water storage, improve operational reliability,

Gollaprolu - Started: - · Completed: Completed
Budget0.60 Cr
📁 RWS Completed
Special Repairs and Improvements to existing O&M of CPWS Scheme to Nagulapalli and other habitations of Kakinada District (Gravity Mains in Gorsa and Isukapalli)

To optimize the CPWS distribution system by rehabilitating gravity mains in Gorsa and Isukapalli, ensuring efficient flow, reduced transmission losses and equitable, dependable water supply to Nagulapalli and nearby habitations

Nagulapalli - Started: - · Completed: Completed
Budget1.35 Cr
📁 RWS Completed
Special Repairs and Improvements to existing O&M of CPWS Scheme to Nagulapalli and other habitations of Kakinada District (Additional treatment plant, Pump sets and Power upgradation).

To enhance the performance and capacity of the CPWS Scheme by upgrading the treatment plant, pump sets, and power systems, ensuring safe, reliable, and uninterrupted drinking water supply to Nagulapalli and other habitations

Nagulapalli - Started: - · Completed: Completed
Budget1.23 Cr
📁 RWS Completed
Providing Pipe line at A.K Mallavaram of CPWS Scheme to Gollaprolu & Other Hbaitations

ensuring safe, clean, and reliable drinking water supply

Gollaprolu - Started: - · Completed: Completed
Budget0.14 Cr
📁 RWS Completed
Replacement of Filter Media for RSF Filters to CPWS Scheme to Gollaprolu & Other Hbaitations

ensuring safe, clean, and reliable drinking water supply

Gollaprolu - Started: - · Completed: Completed
Budget0.12 Cr
📁 RWS Completed
Providing Blowers to 7MLD RSF at CPWS Scheme to Nagulapalli & Other Habitations

ensuring safe, clean, and reliable drinking water supply

Nagulapalli - Started: - · Completed: Completed
Budget0.10 Cr
📁 RWS Completed
Replacement of Filter Media for RSF Filters to CPWS Scheme Nagulapalli & Other Hbaitations

ensuring safe, clean, and reliable drinking water supply

Nagulapalli - Started: - · Completed: Completed
Budget0.20 Cr
📁 R & B Completed
Construction of Double Lane Road Bridge (DLRB) across Suddagadda vagu at Housing Colony, Gollaprolu

improve connectivity and ensure safe, all-weather transportation

Gollaprolu - Started: - · Completed: Completed
Budget3.05 Cr
📁 R & B Completed
Improvements to the riding surface to Samalkota – Uppada road from Km 10/0 to 24/0 in Kakinada District.,

Ensuring improved connectivity, enhanced road safety, and smooth transportation for commuters.

Uppada - Started: - · Completed: Completed
Budget5.10 Cr
📁 R & B Completed
Improvements to K.N.F. road - A.Vizayanagaram (via) Durgada road from km 0/0 to 6/300 in Kakinada District

Ensuring improved connectivity, enhanced road safety, and smooth transportation for commuters.

Durgada - Started: - · Completed: Completed
Budget0.90 Cr
📁 R & B Completed
Improvements to Yendapalli Junction – Ravivarappadu road (via) Nagulapalli road from Km 0.000 to 7.055 in Kakinada District.,

Ensuring improved connectivity, enhanced road safety, and smooth transportation for commuters.

Yendapalli - Started: - · Completed: Completed
Budget3.10 Cr
📁 R & B Completed
Improvements to Ravikampadu – Ramanakkapeta road from Km 5.000 to 9.413 in Kakinada District.,

Ensuring improved connectivity, enhanced road safety, and smooth transportation for commuters.

Ramanakkapeta - Started: - · Completed: Completed
Budget2 Cr
📁 R & B Completed
Construction of Block Public Health Unit at Komaragiri in Kakinada District

Ensuring accessible, quality healthcare services and improved disease surveillance at the community level.

Komaragiri - Started: - · Completed: Completed
Budget0.50 Cr
📁 R & B Completed
Mission pothole free roads program (24)

Improving ride quality, reducing accidents, and enhancing connectivity.

Pithapuram - Started: - · Completed: Completed
Budget6.80 Cr
📁 Public Health Completed
Construction of Anna canteen at Uppada Kothapalli Grama Panchayat

Ensuring clean, hygienic, and affordable food facilities for the needy and general public.

U.Kothapalli - Started: - · Completed: Completed
Budget0.61 Cr
📁 Public Health Completed
Completion of incomplete bridge and providing pavements on either side of Surampeta Bridge

ensuring safe, smooth traffic movement and improved pedestrian safety.

Surampeta - Started: - · Completed: Completed
Budget0.24 Cr
📁 Public Health Completed
Completion of pending works to Tahsildar Office

Ensuring efficient functioning, improved service delivery, and better public access to administrative services.

Gollaprolu - Started: - · Completed: Completed
Budget0.2850 Cr
📁 Public Health Completed
Completion of pending works to UPHC Gollaprolu

ensuring fully functional infrastructure and improved delivery of quality primary healthcare services to the community.

Gollaprolu - Started: - · Completed: Completed
Budget0.8898 Cr
📁 Public Health Completed
Renovation of canteen at Gollaprolu

Ensuring clean, hygienic, and affordable food facilities for the needy and general public.

Gollaprolu - Started: - · Completed: Completed
Budget0.17 Cr
📁 PR Eng Completed
"NREGS works Pallepangula 1.0 (320 roads) "

To enhance rural connectivity works by ensuring durable infrastructure and improved access to villages and essential services.

Pithapuram,Gollaprolu,U.Kothaplli - Started: - · Completed: Completed
Budget29.577 Cr
📁 PR Eng Completed
Construction of Outpatient block in PHC U.Kothapalli

Ensuring improved patient care, reduced congestion, and better access to medical facilities.

U.Kothapalli - Started: - · Completed: Completed
Budget0.05 Cr
📁 PR Eng Completed
Construction of Cattle Shandy in Pithapuram

To develop organized livestock trade infrastructure, ensuring hygienic facilities, better market access for farmers, and efficient livestock transactions.

Pithapuram - Started: - · Completed: Completed
Budget1.35 Cr
📁 Vikasa Completed
Providing RO Plants to 10 PHCs in Pithapuram Constituency

Ensuring access to safe and purified drinking water for patients and healthcare staff.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.10 Cr
📁 NREGS Completed
189 Mini Gokulams

To promote livestock development and rural dairy strengthening , ensuring improved cattle shelter, better animal care, and enhanced milk production for farmers’ livelihood support.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget3.024 Cr
📁 NREGS Completed
Completion of Roof top harvesting structrures Fruit gardeing fodder farming ring trenches flower gardening moringa plantation flood bund desilting canals

To promote integrated rural development and sustainable agriculture

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget3.13 Cr
📁 NREGS Completed
Distributed 49 farm ponds 33 cattle troughs 459 soak pits 1285 compost pits

Enhancing water conservation, livestock care, and waste management in rural areas.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.6475 Cr
📁 Municipality Completed
Construction of Bus Shelter on highway at Pithapuram

To improve public transport facilities and commuter safety by constructing a bus shelter on the highway at Pithapuram, providing comfortable waiting space and protection from weather conditions for passengers.

Pithapuram - Started: - · Completed: Completed
Budget0.10 Cr
📁 Municipality Completed
Repairs to existing water works in Gollaprolu Municipality

To improve the efficiency and reliability of the drinking water supply system in Gollaprolu Nagara Panchayat by carrying out necessary repairs to existing water works, ensuring uninterrupted and safe water supply to residents.

Gollaprolu - Started: - · Completed: Completed
Budget0.7275 Cr
🏥 health Completed
Providing Geyser and Water Purifier to PHC Kothapalli

To improve healthcare facility infrastructure at PHC Kothapalli by providing a geyser and water purifier, ensuring access to safe drinking water and better hygiene for patients and staff.

Kothapalli - Started: - · Completed: Completed
Budget0.0045 Cr
📁 Irrigation Completed
FDR works under TR 27 during floods

To restore damaged infrastructure affected by floods by executing FDR works under TR-27, ensuring rapid rehabilitation of roads, improved connectivity, and restoration of normal public services.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget2 Cr
📁 Horticulture Completed
Under creation of water resources scheme-Farm pond & Under protected cultivation towards erection of Polyhouse and Orchids cultivation

To improve water availability and promote high-value agriculture by creating farm ponds under water resource development and supporting protected cultivation through polyhouses and orchid farming, thereby enhancing productivity, crop quality, and farmer income.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.1974 Cr
📁 Horticulture Completed
Under NMEO-Oil palm Scheme

To promote oil palm cultivation under the NMEO-OP scheme by expanding area coverage, improving farmer income, and ensuring sustainable production of edible oil through enhanced productivity and institutional support.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.8574989 Cr
📁 Horticulture Completed
Under Area expansion of Bamboo – National Bamboo Mission & Under Canopy management of Cashew and mango

To promote sustainable horticulture development by expanding bamboo cultivation under the National Bamboo Mission and improving productivity through canopy management of cashew and mango crops, thereby enhancing farmer income, crop quality, and long-term plantation efficiency.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.0247 Cr
📁 Horticulture Completed
Under Area expansion of Flower crops like Marigold, Chrysanthemum, Rose

To promote horticulture-based livelihood opportunities by expanding the cultivation area of flower crops such as Marigold, Chrysanthemum, and Rose, thereby increasing farmer income and supporting commercial floriculture development.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.0121 Cr
📁 Horticulture Completed
Under Area expansion of Fruit crops like Papaya, Guava and Mango

To enhance horticultural development by expanding the area under fruit crops such as Papaya, Guava, and Mango, thereby improving farmer income, promoting sustainable cultivation, and increasing long-term agricultural productivity.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.0212 Cr
📁 Horticulture Completed
Under Hybrid Vegetable cultivation

To promote modern agriculture under hybrid vegetable cultivation by ensuring improved productivity, better crop quality, higher income to farmers, and efficient use of agricultural resources through advanced farming practices.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.0457 Cr
📁 Fisheries Completed
Sanction of Transponders(satellite devices for real time tracking for safety and security)

To enhance safety and operational efficiency by sanctioning transponders ( satellite-based real-time tracking devices), enabling continuous monitoring, improved security, and better management of field assets and personnel.

U.Kothapalli - Started: - · Completed: Completed
Budget0.8673 Cr
📁 Electrical Completed
Replacement of damaged and erection of intermediate poles at 39 locations in Pithapuram section

To improve the reliability and safety of the power distribution network in Pithapuram Section by replacing damaged poles and erecting intermediate poles at 39 locations, ensuring stable electricity supply and reducing outage risks.

Pithapuram - Started: - · Completed: Completed
Budget0.9298 Cr
📁 Electrical Completed
Providing additional 47 Distribution Transformers & 165 Poles in Kandarada Section

To strengthen and stabilize the local power distribution system by providing improved voltage regulation, reduced overloading, and reliable, uninterrupted electricity supply to consumers.

Kandarada - Started: - · Completed: Completed
Budget1.76 Cr
📁 Electrical Completed
Providing additional 25 Distribution Transformers & 25 Poles in U.Kothapalli Section

To strengthen and stabilize the local power distribution system by providing improved voltage regulation, reduced overloading, and reliable, uninterrupted electricity supply to consumers.

U.Kothapalli - Started: - · Completed: Completed
Budget0.8425 Cr
📁 Electrical Completed
Providing additional 20 Distribution Transformers & 40 poles in Gollaprolu Section

To strengthen and stabilize the local power distribution system by providing improved voltage regulation, reduced overloading, and reliable, uninterrupted electricity supply to consumers.

Gollaprolu - Started: - · Completed: Completed
Budget0.50 Cr
📁 Electrical Completed
Providing additional 36 Distribution Transformers in Pithapuram Section

To strengthen the local electricity distribution network by providing improved voltage stability, reduced overloading, and reliable, uninterrupted power supply to consumers.

Pithapuram - Started: - · Completed: Completed
Budget1.58 Cr
📁 Electrical Completed
Construction of 33/11 kV Substation at Pithapuram

To strengthen the power infrastructure ensuring reliable, stable, and uninterrupted electricity supply to meet the growing demand This will improve voltage regulation, reduce transmission losses, enhance load management.

Pithapuram - Started: - · Completed: Completed
Budget2.95 Cr
🎓 education Completed
Providing of RO Plant to Gollaprolu UP school

To provide safe, purified drinking water by installing an RO plant, ensuring better health, hygiene, and improved well-being of students.

Gollaprolu - Started: - · Completed: Completed
Budget0.04 Cr
🎓 education Completed
Construction of 13 Bio-Toilets in Pithapuram Constituency for 7 Schools

To improve sanitation and hygiene facilities in 7 schools of Pithapuram Constituency by constructing 13 bio-toilets, ensuring a clean, safe, and environmentally sustainable learning environment for students.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.26 Cr
📁 Sports Completed
Providing Sports Kits to all 25 ZPHS in Pithapuram Constituency

To promote sports and physical fitness among students by providing sports kits encouraging participation in games and overall student development.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.16 Cr
🎓 education Completed
Providing science lab equipment to all 33 schools in Pithapuram Constituency

To strengthen science education and promote practical learning by providing modern laboratory equipment enhancing students’ experimental skills and academic performance.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.099 Cr
📁 HDY CMO Completed
Appreciating the work of 8 Nurses by giving 25000 to them

To recognize and encourage the dedicated service of 8 nurses by providing financial appreciation of ₹25,000 acknowledging their contribution to healthcare and public service.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.02 Cr
📁 HDY CMO Completed
Distribution of salary to 42 Orphans @ 5000 per month

To provide financial support and ensure social security for 42 orphans by distributing a monthly assistance of ₹5,000, helping meet their basic needs and improve their welfare.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.42 Cr
📁 HDY CMO Completed
Distributing Electrical safety kits to 323 electricians

To provide occupational safety and support skilled workers by distributing electrical safety kits , ensuring safer working conditions and reducing risk of accidents.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget0.165 Cr
📁 BC Corporation Completed
Training and Distribution of 3456 Sewing machine equipment

To empower beneficiaries through livelihood support by distributing 3,456 sewing machines, enabling self-employment opportunities and improving household income generation.

Pithapuram,Gollaprolu,U.Kothapalli - Started: - · Completed: Completed
Budget8.64 Cr
📁 APSRTC Completed
Pithapuram Bus Station Seating Fans Lightings Roof repairs Painting and Toilet repairs CC Drive way repairs and Gollaprolu Bus Station CC Drive way Boundary Painting etc

To upgrade passenger amenities and infrastructure at Bus Stations by providing seating, fans, lighting, roof and toilet repairs, painting, and CC driveway improvements, ensuring safe, comfortable, and user-friendly facilities.

Pithapuram,Gollaprolu - Started: - · Completed: Completed
Budget0.2829 Cr
📁 APEWIDC Completed
Finishing works and providing supplements to ZPHS Nagulapalli MPPS 1 Gollaprolu and Govt Jr College Gollaprolu

ensuring fully functional and improved educational infrastructure. This will enhance classroom usability, student comfort, and overall academic environment, supporting better learning outcomes and institutional efficiency

Nagulapalli,Gollaprolu - Started: - · Completed: Completed
Budget0.0385 Cr
📁 APEWIDC Completed
Providing of RO Plants to Social Welfare Girls Hostel Chebrolu and MPPS Kalavaladoddi and Venkatarayapuram of U.Kothapalli(M)

To ensure safe and clean drinking water by providing RO plants to promoting better health and hygiene for students.

U.Kothapalli,Gollaprolu - Started: - · Completed: Completed
Budget0.029 Cr
📁 APEWIDC Completed
Major & Minor Repairs to SW Boys Hostel at Moolapeta (V) of U.Kothapalli (M) in Kakinada District

To improve the living conditions and safety of students by undertaking major and minor repairs ensuring a secure, hygienic, and comfortable residential environment.

Mulapeta - Started: - · Completed: Completed
Budget0.105 Cr
📁 APEWIDC Completed
Development of Play Field in Sri BMR Girls High School Pithapuram

To provide improved sports infrastructure and promoting physical fitness and overall development of students.

Pithapuram - Started: - · Completed: Completed
Budget0.105 Cr
📁 APEWIDC Completed
Roof leakage repairs and water supply to ZPHS Boys in Gollaprolu(M)

To rectify roof leakages and improve water supply ensuring a safe, hygienic, and conducive environment for students.

Gollaprolu - Started: - · Completed: Completed
Budget0.23 Cr
📁 APEWIDC Completed
Repairs to Integrated Social Welfare Girls Hostel in Pithapuram(M)

To improve living conditions and safety by carrying out necessary repairs, ensuring a secure, hygienic, and comfortable environment for students.

Pithapuram - Started: - · Completed: Completed
Budget3.65 Cr
🌾 agriculture Completed
Distribution of Tarpaulins 2000

To support farmers by distributing 2,000 tarpaulins, protecting harvested crops and agricultural produce from rain and adverse weather conditions

Pithapuram,Gollaprolu - Started:
Budget0.26 Cr
🌾 agriculture Completed
Distribution of Agriculture implements

To enhance agricultural productivity by distributing modern implements to farmers, reducing manual effort and improving efficiency in farming operations.

Pithapuram,Gollaprolu - Started: - · Completed: Completed
Budget1.68 Cr
📁 Endowment Ongoing
"Sri Jagannadha & Satyanarayana Swamy Temple, Mulapeta(V) , Kothapalli(M), Kakinada"

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Mulapeta basement completed. slab work is in progress Started: 09.01.2026 · Completed: 31.07.2026
Work Execution Photos:
Budget0.1Cr
📁 Endowment Ongoing
Re Constructions Sri Bhramarambha Malleswara ST Mangiturthi (V)

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Mangiturti Slab work is in progressubmitted. Awaiting approval Started: - · Completed: 01.03.2027
Work Execution Photos:
Budget1.3 Cr
📁 Endowment Ongoing
Improvements to Sri Devi Bhoodevi Sametha Sri Venkateswara Swamy Temple CHITRADA

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Chitrada Revised plan submitted. Awaiting approval Started: 09.01.2026 · Completed: -
Work Execution Photos:
Budget0.7 Cr
📁 Endowment Ongoing
Improvements to Sri Venugopala Swamy Temple Uppada Kothapalli

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

U.Kothapalli Pradakshina chapta PCC work completed. Paintings in progress Started: 09.01.2026 · Completed: 01.08.2026
Work Execution Photos:
Budget0.1 Cr
📁 Endowment Ongoing
Improvements to Sri Venugopala Swamy Temple KOMARAGIRI

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Komaragiri Compound wall & Floorings is in progress Started: 09.01.2026 · Completed: 01.08.2026
Work Execution Photos:
Budget0.2 Cr
📁 Endowment Ongoing
Improvements to Sri Seetha Rama Swamy Temple GORSA

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Gorsa Leaky Proof Treatment to Vimanam is in progress. Scaffolding work to Rajagopuram is in progress Started: 09.01.2026 · Completed: 01.12.2026
Work Execution Photos:
Budget0.4 Cr
📁 Endowment Ongoing
Improvements to Sri Sitharama Anjaneya Muth Medaragudem, Mirapakayala Veedhi

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Site clearance and Dismantling completed. Marking to be done Started: 09.01.2026 · Completed: 31.10.2026
Work Execution Photos:
Budget0.6 Cr
📁 Endowment Ongoing
Improvements to Sri Rukhmini Satyabhama Sametha Venugopala Swamy Temple Kolanka

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Kolanka Paintings and Finishings work is in progress Started: 09.01.2026 · Completed: 07.08.2026
Work Execution Photos:
Budget0.05 Cr
📁 Endowment Ongoing
Improvements to Sri Venugopala Swamy Temple VIRAVADA

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Viravada Ornamental plasterings to Vimanam is in progress Started: 09.01.2026 · Completed: 1.11.2026
Work Execution Photos:
Budget0.15 Cr
📁 Endowment Ongoing
Improvements to Sri Visweswara Swamy Temple VIRAVADA

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Viravada Ornamental plasterings to Vimanam is in progress Started: 09.01.2026 · Completed: 1.11.2026
Work Execution Photos:
Budget0.1 Cr
📁 Endowment Ongoing
Improvements to Sri Vijaya Janardhana Swamy Temple RAMANAKKAPETA

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Ramanakkapeta Raja Gopuram Marking given, Ornamental plasterings to Prakara Mandapam is in progress Started: 09.01.2026 · Completed: -
Work Execution Photos:
Budget0.45 Cr
📁 Endowment Ongoing
Improvements to Sri Jagannadha Swamy & Sri Satyanarayana Swamy Temple Mulapeta

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Mulapeta basement completed. slab work is in progress Started: 09.01.2026 · Completed: 01.12.2026
Work Execution Photos:
Budget0.2 Cr
📁 Endowment Ongoing
Improvements to Sri Ramalingeswara Swamy Temple GOLLAPROLU

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Gollaprolu Painiting is in progress Started: 09.01.2026 · Completed: -
Work Execution Photos:
Budget0.2 Cr
📁 Endowment Ongoing
Improvements to Sri Sitharama Swamy Temple Chebrolu

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Chebrolu Painiting is in progress Started: 09.01.2026 · Completed: -
Work Execution Photos:
Budget0.4 Cr
📁 Endowment Ongoing
Improvements to Sri Someswara Swamy Temple PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Painiting is in progress Started: 09.01.2026 · Completed: -
Budget0.25 Cr
📁 Endowment Ongoing
Improvements to Sri Venugopala Swamy Temple PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Dismantling is in progress Started: 09.01.2026 · Completed: -
Budget0.5 Cr
📁 Endowment Ongoing
Improvements to Sri Kunti Madava Swamy Temple PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Kalakshepa mandapam Marking given, Foundation work is in progress Started: 09.01.2026 · Completed: -
Budget0.4 Cr
📁 Endowment Ongoing
Improvements to Sri Jai Ganesh Temple PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Dismantling completed, awaiting for structural designs Started: 09.01.2026 · Completed: -
Budget0.65 Cr
📁 Endowment Ongoing
Improvements to Sri Samasthanam Choultry PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Dismantling completed foundation work is in progress Started: 09.01.2026 · Completed: 01.12.2026
Budget0.4 Cr
📁 Endowment Ongoing
Improvements to Sri Pada Sri Vallabha Maha Samsthanam PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Estimates under preparation Started: - · Completed: -
Budget2 Cr
📁 Endowment Ongoing
Improvements to Sri Kukkuteswara Swamy Temple PITHAPURAM

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Tenders opened & Evaluation is in progress Started: 12/5/2025 · Completed: 30.06.2026
Budget5 Cr
📁 Endowment Ongoing
Reconstruction of Sakaleswara Swamy temple at Pithapuram

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Pithapuram Finishings is in progress Started: 12/5/2025 · Completed: 30.07.2026
Budget1.1 Cr
📁 Endowment Ongoing
Construction of Kalakshepa Mandapam of Seetharama ST Chebrolu

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Chebrolu Ornamental work is in progress Started: 8/5/2025 · Completed: 25.07.26
Budget0.485 Cr
📁 Endowment Ongoing
Construction of Prakara Mandapam of Seetharama ST Gollaprolu

To improve temple infrastructure and spiritual ambiance leading to overall temple experience

Gollaprolu Ornamental Plastering is in progress Started: 17/05/25 · Completed: 30.07.2026
Budget1.32 Cr
📁 Endowment Ongoing
Construction of new TTD Kalyana Mandapam in U.Kothapalli Mandal

To provide a modern and accessible community facility by constructing a new TTD Kalyana Mandapam in U. Kothapalli Mandal, supporting social, cultural, and religious functions

U Kothapalli - Started: -
Budget2 Cr
🎓 education Ongoing
Mppschool Kp Mallam Major repairs works

To improve the safety and functionality by undertaking major repair works, ensuring a secure, comfortable, and better learning environment for students.

Mallam - Started: -
Budget0.06 Cr
🎓 education Ongoing
Construction of compound wall Mppschool AK Mallavaram

To ensure the safety and security of students and school property by constructing a compound wall creating a protected and conducive learning environment.

Ak Mallavaram - Started: -
Budget0.09375 Cr
🎓 education Ongoing
Construction of compound wall Mppschool No 1 Ponnada

To ensure the safety and security of students and school property by constructing a compound wall creating a protected and conducive learning environment.

Ponnada - Started: -
Budget0.09375 Cr
🎓 education Ongoing
Construction of Cwsn toilet Mppschool GN Gollaprolu , Ramp with Railing

by constructing a CWSN-friendly toilet and providing safe drinking water facilities, ensuring accessibility, hygiene, and a supportive learning environment for all students.

Gollaprolu - Started: -
Budget0.059 Cr
🎓 education Ongoing
Construction of Construction of Cwsn toilet Mppschool No 1 Uppada and Providing Drinking water supply

By constructing a CWSN-friendly toilet and providing safe drinking water facilities, ensuring accessibility, hygiene, and a supportive learning environment for all students.

Uppada - Started: -
Budget0.097 Cr
🎓 education Ongoing
Construction of Autism center at SBMR Govt Girls High school Jaggayyacheruvu Pithapuram

Providing specialized educational support, therapy, and inclusive learning facilities for children with autism, ensuring their overall development and better learning opportunities

Pithapuram - Started: -
Budget0.4 Cr
🎓 education Ongoing
Construction of Autism center at Zpph school Chebrolu

Providing specialized educational support, therapy, and inclusive learning facilities for children with autism, ensuring their overall development and better learning opportunities

Chebrolu - Started: -
Budget0.4 Cr
🎓 education Ongoing
Construction of Chemistry lab at ZPHS Mulapeta

To enhance science education at ZPHS Mulapeta by constructing a well-equipped chemistry laboratory, facilitating practical learning and improving academic outcomes for students.

Mulapeta - Started: -
Budget0.1558 Cr
📁 Sports Ongoing
Completion of Existing Kreeda Vikasa Kendram Indoor Stadium with Execution in Full shape multy purpose i.e.Badminton Volleyball & Basketball etc.

To promote sports development, youth engagement, and provide modern infrastructure for training, recreation,and competitive events

Pithapuram - Started: 23.01.2026 · Completed: 22.07.2026
Budget0.768 Cr
📁 RWS Ongoing
Special repairs & Improvements to CPWS Scheme to Gollaprolu and other habitations of Gollaprolu Mandal in Kakinada district (Pumping Main, Power upgradation and motors)

Carrying out special repairs and upgrades to the pumping main, power systems, and motors will reduce breakdowns, improve energy efficiency, and ensure continuous, adequate, and sustainable drinking water supply to Gollaprolu and surrounding habitation

Gollaprolu - Started: 24.02.2026 · Completed: 15.05.2026
Budget0.72 Cr
📁 RWS Ongoing
Special Repairs and Improvements to existing O&M of CPWS Scheme to Nagulapalli and other habitations of Kakinada District (Raw water Pumping main)”

To ensure resilient and uninterrupted drinking water supply by upgrading and strengthening the raw water pumping main under the CPWS Scheme, improving efficiency, reducing losses and securing long-term water availability

Nagulapalli - Started: 24.02.2026 · Completed: 15.05.2026
Budget6.99 Cr
📁 R & B Ongoing
a) Improvements to Kathipudi - Pamarru road (NH-214) in Gollaprolu village limits from Km 9/760 to 12/960 in Kakinada District b) Improvements to Kathipudi - Pamarru road (NH-214) in Chebrolu village limits from Km 4/600 to 8/185 in Kakinada District

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

Gollaprolu - Started: -
Budget3.9 Cr
📁 R & B Ongoing
Improvements to Riding Surface Gollaprolu -Rajupalem road (SH-163) from KM 0/0 to 5/400 in Kakinada District

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

Gollaprolu - Started: -
Budget2 Cr
📁 R & B Ongoing
Improvements to Ameenabad to U.Kothapalli road from km 0/0 to 5/500 in Kakinada District

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

U Kothapalli - Started: 02.02.2026 · Completed: 22.10.2026
Budget3.82 Cr
📁 R & B Ongoing
Improvements to the road (a) Pithapuram - Nemam road from Km 0/260 to 6/690

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

Pithapuram - Started: 09.01.2026 · Completed: 25.10.2026
Budget2.1 Cr
📁 R & B Ongoing
Improvements to the riding surface to Panduru – U.Kothapalli road from Km 0/0 to 9/279 in Kakinada District.,

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

U Kothapalli - Started: 09.01.2026 · Completed: 21-09-2026
Budget2.3 Cr
📁 R & B Ongoing
Improvements to Jalluru to LN.Puram (via) Mallam, Viravada from km 3/025 to 5/500 of in Kakinada District

To upgrade the road stretch ensuring improved connectivity, enhanced road safety, and smoother transportation for commuters.

Jalluru - Started: 09.01.2026 · Completed: 31-05-2026
Budget0.95 Cr
🏥 health Ongoing
Construction of Block public health unit at Chebrolu

To strengthen healthcare infrastructure by establishing a Block Public Health Unit ensuring accessible, quality primary healthcare and improved disease surveillance.

Chebrolu - Started: -
Budget0.5 Cr
🎓 education Ongoing
Construction of Degree College 1st floor at Pithapuram and construction of toilet blocks

To enhance higher education infrastructure in Pithapuram by constructing the 1st floor of the Degree College and providing adequate toilet facilities, ensuring improved capacity, hygiene, and a better learning environment.

Pithapuram - Started: -
Budget1.1 Cr
📁 R & B Ongoing
Construction of ROB in lieu in LC No 431 at Railway KM 640/30-32 in Pithapuram Municipal Limits

To enhance road–rail safety and ensure uninterrupted traffic flow by constructing a Road Over Bridge (ROB)

Pithapuram Waiting for Sanction under PM Gathi shakthi Scheme Started: -
Budget98 Cr
📁 Public Health Ongoing
Gollaprolu municipality water works (AMRUT 2.0)

To strengthen water supply infrastructure in Gollaprolu Municipality under AMRUT 2.0, ensuring reliable, safe, and sustainable drinking water for all households

Gollaprolu "300KL ELSR - Steps Foundation & ground level Brace beam in progress Distribution pipeline Network - Started: -
Budget2.16 Cr
📁 Public Health Ongoing
Pithapuram municipality water works (AMRUT 2.0)

To strengthen water supply infrastructure in Pithapuram Municipality under AMRUT 2.0, ensuring reliable, safe, and sustainable drinking water for all households.

Pithapuram "600KL ELSR - Earth Work , Sandfilling , PCC completed Raft steel work is in progress 400KL ELSR - D Started: -
Budget57.37 Cr
📁 Public Health Ongoing
Water works under AIIB for Gollaprolu Municipality water works

This major AIIB-funded water works project will transform drinking water coverage and quality for the entire Gollaprolu Municipality and surrounding habitations.

Gollaprolu "800KL ELSR - Earth Work Yet to start 700KL ELSR - Columns upto Below Ground Level in Completed Back Started: -
Budget79.9 Cr
📁 Public Health Ongoing
Beautification of Mogali Sureedu Cheruvu in Gollaprolu

The Mogali Sureedu Cheruvu beautification will transform the water body into a public recreational and ecological asset for Gollaprolu residents.

Gollaprolu Work Grounded- Jungle Clearance completed . Pre measurements for Bund Correction and compilation Started: -
Budget4.06 Cr
📁 PR Projects Ongoing
Construction of roads at various places

To enhance Durable and easily accessible infrastructure by connecting roads

Pithapuram,Gollaprolu,U.Kothapalli 1 work completed,BT is completed for 4 works , and bridge design finalized detailed working estimate Started: 09.12.2026 · Completed: 30.06.2026
Budget10.95 Cr
📁 PR Projects Ongoing
Construction of various rural 66 roads under SASCI APRRSP Grants

To improve rural connectivity by laying for various roads ensuring durable infrastructure and better access to villages and essential services.

Pithapuram,Gollaprolu,U.Kothapalli As the two contractors who have submitted the bids are found to be ineligible and disqualified in th Started: 09.01.2026
Budget92.34 Cr
📁 PR Eng Ongoing
Pithapuram Constituency Pallepanduga 2.0 Roads under NREGS

To upgrade rural road infrastructure ensuring improved connectivity, durable access, and enhanced livelihood opportunities for rural communities.

Pithapuram,Gollaprolu,U.Kothapalli - Started: 09.01.2026 · Completed: 30.08.2026
Budget5.762 Cr
📁 PR Projects Ongoing
Construction of Embankment for Community(Gravelling and Revetment) from R&B road to Fisheries Jetty in Amaravilli(2 works)

To strengthen coastal infrastructure by constructing durable embankments with gravelling and revetment from the R&B road to the fisheries jetty at Amaravilli, ensuring safe and all-weather access.

Amaravalli Rivetment work is in Progress Started: -
Budget0.452 Cr
📁 PR Projects Ongoing
Construction of Village Health Clinics (12) Grama Panchayat Buildings(2)

These facilities will bring primary healthcare and administrative services directly to rural habitations across the constituency.

Pithapuram,Gollaprolu,U.Kothapalli 12 Health cilinics and 2 GP building started Started: 01.03.2026 · Completed: 09.11.2026
Budget5.17 Cr
🎓 education Ongoing
Construction of School Buildings to MPPS Nidanamdoddi

To strengthen educational infrastructure by constructing new school buildings for MPPS Nidanamdoddi, ensuring safe classrooms, improved learning facilities, and a conducive academic environment for students.

Nidanam Doddi - Started: -
Budget0.1574 Cr
🎓 education Ongoing
Construction of School Buildings to MPPS Sontivaripakalu

To strengthen educational infrastructure by constructing new school buildings for MPPS Sontivaripakalu, ensuring safe classrooms, improved learning facilities, and a conducive academic environment for students.

Sontivaripakalu - Started: -
Budget0.1574 Cr
🎓 education Ongoing
Construction of School Buildings to MPPS Isukapalli

To strengthen educational infrastructure by constructing new school buildings for MPPS Isukapalli, ensuring safe classrooms, improved learning facilities, and a conducive academic environment for students.

Isukapalli - Started: -
Budget0.1574 Cr
🎓 education Ongoing
Construction of School Buildings MPPS Ravindrapuram

To strengthen educational infrastructure by constructing new school buildings for MPPS Ravindrapuram, ensuring safe classrooms, improved learning facilities, and a conducive academic environment for students.

U.Kothapalli - Started: 04.11.2024
Budget0.1574 Cr
📁 NREGS Ongoing
Construction of cattle sheds(178)

These cattle sheds will improve livestock management for rural farming households, directly benefiting farmers' livelihoods across the constituency.

Pithapuram,Gollaprolu,U.Kothapalli - Started: 09.01.2026 · Completed: 01.04.2027
Budget3.7735 Cr
📁 NREGS Ongoing
Compound walls sanctioned for 17 schools(39 works)

To improve safety standards and ensure a conducive learning atmosphere for students and staff and to protect school infrastructure and assets while enhancing overall campus management and security .

Pithapuram,Gollaprolu,U.Kothapalli - Started: 09.01.2026 · Completed: 30.07.2026
Budget3.1735 Cr
📁 Municipality Ongoing
Construction of CC Drains in Gollaprolu Municipality

To improve drainage infrastructure in Gollaprolu Municipality by laying CC drains, ensuring proper stormwater flow, preventing waterlogging, and enhancing sanitation.

Gollaprolu 11 works work order issued Started: 09.01.2026 · Completed: 02.10.2026
Budget3.00 Cr
📁 Municipality Ongoing
Construction of CC Drains & Development of Model Road in Pithapuram Municipality

To strengthen urban infrastructure in Pithapuram Municipality by improving drainage through CC drains and developing a model road, ensuring better sanitation, traffic flow, and overall urban quality.

Pithapuram out of 39 works; a) 15 works - Work order Issued ( 3 Works Completed, 5 Works are inprogress), Started: 09.01.2026 · Completed: 15.10.2026
Budget5.00 Cr
📁 Municipality Ongoing
Development of Jaggayyacheruvu Pithapuram municipality

Development works at Jaggayyacheruvu include lake beautification, fencing, walkways, and landscaping to create a public recreational space for Pithapuram residents.

Pithapuram 1. MPLADS - 3 works Drains were completed and 2. Housing Appartment Repair works Out of 13 works - 1 Started: - · Completed: 30.06.2026
Budget1.00 Cr
📁 Municipality Ongoing
Beautification of Pithapuram municipality(Padagaya temple to Sub-Registrar Office

To enhance the aesthetic appeal and urban environment of Pithapuram municipality along the stretch from Padagaya Temple to the Sub-Registrar Office, improving public spaces and visitor experience.

Pithapuram out of 4 works- 3 works Tender Participated and for BT Road work - 4th call no one participated . El Started: - · Completed: -
Budget1.5 Cr
📁 Municipality Ongoing
Development of Gollaprolu municipality

To strengthen urban infrastructure and service delivery in Gollaprolu municipalitie, ensuring sustainable development and improved quality of life for residents.

Gollaprolu - Started: - · Completed: 02.10.2026
Budget1.00 Cr
📁 Municipality Ongoing
Development of Pithapuram municipality(BPS & LRS Grant ,15th FC)

To strengthen urban infrastructure and service delivery in Pithapuram ensuring sustainable development and improved quality of life for residents.

Pithapuram Out of 40 Works - 36 works completed, 4 Works to be changed (13.00 Lakhs) - New Work to be Proposed Started: - · Completed: 25.06.2026
Budget3.00 Cr
📁 Irrigation Ongoing
140 O and M works

To restore and strengthen irrigation infrastructure, ensuring efficient water flow, improved irrigation supply, and system reliability

Pithapuram Out of 140 works, from YI System 11 works are in progress, 34 works completed and 10 works are to be Started: 02.05.2026 · Completed: 15.07.2026
Budget6.7 Cr
📁 Irrigation Ongoing
69 FDR works

To restore and strengthen irrigation infrastructure, ensuring efficient water flow, improved irrigation supply, and system reliability

Pithapuram Out of 69 works, from YI System 12 works are in progress, 16 works completed and 3 works are to be s Started: - · Completed: 15.07.2026
Budget3.79 Cr
📁 Forest Ongoing
Sanction of Development of Nagaravanam at Pithapuram

By developing Peetikapuravanam there will be a creation of green space and a Park leading to Tourism

Pithapuram Work done for 81.48024 Lakhs. Play area instalistion,carpet grass and shed grass dibbling on going w Started: - · Completed: 30.07.2026
Budget0.95 Cr
📁 Electrical Ongoing
Erection of Separate 33 kV line from Pithapuram to Donthamuru

To ensure reliable, high-quality power supply and reduce load on existing lines by strengthening the distribution network

Pithapuram 90 % work is completed , submitted proposals for under ground cable at 3 locations to maintain prope Started: - · Completed: 28.08.2026
Work Execution Photos:
Budget1.84 Cr
📁 APMSIDC Completed
Construction of Stand Alone Govt Ayush Dispensary (GAD)

The Stand-Alone Government Ayush Dispensary at Viravada will provide accessible traditional medicine services to rural communities

Viravda - Started: - · Completed: Completed
Budget0.30 Cr
🏥 health Ongoing
Upgradation of existing CHC Pithapuram to AH

Upgrading the existing CHC to a full Area Hospital will significantly improve tertiary healthcare access for Pithapuram and surrounding mandals.

Pithapuram MCH Block side Ground floor slab concrete work complete & First floor Columns concrete completed and Started: 26.06.2025 · Completed: 31.03.2027
Work Execution Photos:
Budget34 Cr
📁 Industries Ongoing
APIIC flatted factory complex

The Flatted Factory Complex will provide affordable, multi-storeyed industrial space to small and medium enterprises, catalysing local economic growth and employment in the Pithapuram region.

Pithapuram "FFC pitapuram plinth beam concrete work completed and Plinth beam back filling and soil consolidati Started: 02.07.2025 · Completed: 30.02.2026
Work Execution Photos:
Budget9.6 Cr
📁 APEWIDC Ongoing
"Konapapapeta selected under Climate resilient Coastal Fishermen Village"

Konapapapeta has been selected under this Central Government programme to build climate-resilient infrastructure protecting coastal fishing communities from natural disasters.

Konapapapeta Brick work is under progress and Toilet Block Completed upto Basement level Started: 09.01.2026 · Completed: 20.09.2026
Work Execution Photos:
Budget2 Cr